DEMO · Ecostep, Inc. | Multicraft Contractor | Pharmaceutical & Light Industrial | Northern California
CSLB #1006147  ·  B / C-2 / C-6 / C-36  ·  Licensed, bonded, insured
Northern California  ·  707-373-2180

Multicraft contractor · Northern California

The crafts most contractors sub out, we self-perform.

Ecostep works inside pharmaceutical, light industrial, and commercial facilities. Insulation, piping, millwork, and general building sit under one license and one contract, so one company answers for the schedule.

Process piping and equipment inside an operating plant
Sterile fill suite Process piping, insulation
and lab casework
Hayward, CA
CSLB B
General building
Prime contracting and full scope
CSLB C-2
Insulation and acoustical
Mechanical insulation systems
CSLB C-6
Millwork and casework
Shop-built, CNC machined
CSLB C-36
Piping and plumbing
Process and domestic systems
4Crafts self-performed
under one license
30+Years our principal has
worked in the trades
140Projects completed
to date
0.78Experience modification
rate, current period

Markets

Facilities that cannot stop running while we work.

Most of our work happens in occupied, operating buildings. We plan around production schedules, clean areas, and shutdown windows instead of asking the facility to plan around us.

Clean process equipment in a controlled environment
01

Pharmaceutical and biotech

Lab and clean environment build-outs, process piping, casework, and mechanical insulation held to documented tolerances.

Industrial equipment on a plant floor
02

Light industrial

Manufacturing and processing plants where the mechanical scope has to fit a short window without touching production.

Stainless process machinery detail
03

Food and beverage

Sanitary environments where finish quality and material selection carry as much weight as the schedule.

Exterior mechanical systems on a distribution building
04

Warehouse and distribution

Office build-outs, envelope work, and mechanical upgrades inside active distribution facilities.

Exposed mechanical runs in a commercial interior
05

Commercial and institutional

Tenant improvements and renovations phased around occupancy in buildings that stay open through construction.

Two tradesmen reviewing work on site
06

Design-build

Full design-build delivery when you would rather hand over a problem than manage a set of drawings.

Self-performed capabilities

Four crafts. One contract. One party accountable.

Each of these sits on our California contractor license. Our own people do the work instead of a chain of subcontractors with separate schedules and separate stories about what went wrong.

C-2

Mechanical insulation

Pipe, duct, vessel, and equipment insulation, including removal and replacement around operating systems. This is where the company started and it remains the craft we are known for.

  • Pipe and duct
  • Vessel lagging
  • Metal jacketing
  • Removal and replacement
  • Acoustical
  • Energy audits
Insulated pipe runs
C-36

Piping and plumbing

Holding the plumbing classification in house means we set the piping sequence ourselves. On a mechanical scope piping usually drives the schedule, so controlling it directly keeps a shutdown window from slipping.

  • Process piping
  • Domestic and sanitary
  • Equipment sets
  • Repipes and tie-ins
  • Gas lines
  • Backflow
Valves and piping in a mechanical room
C-6

Millwork and casework

We build casework rather than order it. When an opening is not standard or a custom order carries a twelve week lead time, our own shop closes the gap. We run a five by twelve foot CNC router for machined panels and precision components.

  • Shop-built casework
  • Lab and clean-area millwork
  • CNC panels
  • Doors and hardware
  • Finish carpentry
Carpenter working a piece of stock
B

General building

The general building classification lets us hold the prime contract and carry the whole scope, including trades outside our own four. You sign one agreement and hold one company responsible for the result.

  • Prime contracting
  • Tenant improvements
  • Framing
  • Selective demolition
  • Envelope
  • Code analysis
Crew working on an active build

Approach

Every trade you hand to a separate contractor is another schedule to chase.

A facility manager coordinating four contractors is really managing four foremen, four insurance certificates, and four versions of who caused the delay.

“We gave them a nine day shutdown window and they finished the piping and insulation in seven. One foreman, one phone number, no finger pointing.”

Facilities Director · Bay Area pharmaceutical manufacturer
Tradesman working on large equipment
01

Site walk

We look at existing conditions, access, and the constraints your operation puts on the schedule before we price anything.

02

Code review and drawings

We handle code analysis and produce stamped construction drawings, so the permit path stays our problem.

03

Scope and sequence

You get a written scope tied to a sequence, phased around shutdown windows or occupied areas where those apply.

04

Self-performed execution

Our crews run the insulation, piping, millwork, and building scope. Outside trades come in only where work falls outside our classifications.

05

Inspection and closeout

We carry every permit to final inspection and hand over the documentation your facility records need.

Safety and prequalification

The paperwork your procurement team needs, ready before they ask.

Pharmaceutical and industrial clients prequalify contractors before anyone prices work. We keep that package current so a bid never stalls on documentation.

Prequalification

Registered and current with ISNetworld and Avetta. Account numbers and grading letters go out with every bid package on request.

Experience modification rate

Current EMR of 0.78, verified annually by our workers' compensation carrier. The rate letter is available on request.

Site protocols

Job hazard analysis before each phase, daily toolbox talks, lockout and tagout coordinated with plant staff, and hot work permits pulled through your process.

Insurance

General liability, workers' compensation, and auto. Certificates and additional insured endorsements go out the same day you request them.

Licensing

California contractor license #1006147, active, carrying B, C-2, C-6, and C-36 classifications. Verify it at cslb.ca.gov.

Training records

Every crew member holds OSHA 10. Supervisors hold OSHA 30. Confined space entry, respirator fit testing, and cleanroom gowning protocol are current across the crew.

Affiliations and certifications

Memberships and prequalification registrations we maintain year round.

ISNetworld
Avetta
MCAA
Gold Shovel Standard
CSLB Licensed

Projects

Work we have finished.

Each project needs the facility type, the scope we performed, and the city. Client names stay off the page unless they approve.

Piping headers in a plantProcess piping and insulation · Hayward, CA
Insulated line detailChilled water insulation · Fremont, CA
Mechanical equipment installationEquipment set and tie-ins · Richmond, CA
Crew member on structureMezzanine and platform · Livermore, CA
Vessel and stackVessel lagging and jacketing · Benicia, CA
Stacked pipe stockShop fabrication · Pleasant Hill, CA

Who we work with

We work directly for facility owners and as a specialty subcontractor to general contractors. Client names appear here once each one approves it.

Pharmaceutical
manufacturer
Contract research
laboratory
Food and beverage
processor
Regional general
contractor
Distribution
operator

Leadership

Amer Abusafieh

Founder and President. Responsible Managing Officer on the license.

Amer came up through a union apprenticeship and spent his early career as a journeyman insulator in process plants, where a mistake shows up as downtime rather than a punch list item. He earned his California general contractor license in 2003 and built Ecostep around the trades he already knew how to do himself. He still walks every job and prices every scope.

Placeholder image standing in for a portrait of Amer Abusafieh

Company at a glance

Legal entityEcostep, Inc., a California corporation
Contractor licenseCSLB #1006147, active
ClassificationsB General Building
C-2 Insulation and Acoustical
C-6 Cabinet, Millwork and Finish Carpentry
C-36 Plumbing
Delivery methodsDesign-build, prime contracting, subcontract to a general contractor
Service areaContra Costa, Alameda, San Francisco, San Mateo, Santa Clara, Solano, Napa, and Marin counties
Bonding capacity$2,000,000 single project · $5,000,000 aggregate
Emergency service24 hour response for facilities under an active agreement
OfficePleasant Hill, California

Contact

Tell us what the scope looks like.

Send the basics and we come back with a capability statement, insurance certificates, and a time to walk the site.

Call the office
707-373-2180
Email
info@ecostepinc.com
License
CSLB #1006147
Classifications
B · C-2 · C-6 · C-36
Response time
Same business day

Prefer to talk it through? Call 707-373-2180.

Scroll to Top